Objective: Stabilize the Generators
Narrative
Recovery power drill: recover canisters and scavenged generator guts so Engineering can keep something spinning through midnight.
Requirements
- Deposit 2x Empty Canister (Deposit empty canisters)
- Deposit 2x Ruined Generator Parts (Deposit ruined generator parts)
Rewards
- 1x Battery
Failure Penalty
Generators remain unreliable under peak load. (Defense: 0)