Objective: Evac Infrastructure Audit
Narrative
Protocol Evac requires a logistics uplink, Citadel Aegis Core, and completed Citadel Systems Integration research before the beacon can be raised.
Requirements
- Build Logistics Uplink (Build Logistics Uplink)
- Build Citadel Aegis Core (Build Citadel Aegis Core)
- Complete Citadel Systems Integration
Rewards
None
Failure Penalty
Evac packages remain locked until citadel integration is complete. (Defense: 0)