Objective: Microfuse Grid Audit
Narrative
Cascading fuse blows are masking real faults. Stage micro fuses and copper so Electric can hard-audit the bus.
Requirements
- Deposit 2x Micro Fuse (Deposit micro fuses)
- Deposit 2x Copper Wiring (Deposit copper wiring)
Rewards
- 1x Battery
- 1x Shock Capacitor
Failure Penalty
Intermittent trips sap confidence in the grid. (Defense: -1)